29/10/2021

ARCEP Consultation 5G / FSS Coexistence in C-band

ESOA is pleased to respond to the ARCEP consultation on the terms and conditions allowing coexistence between 5G networks in the 3.4 – 3.8 GHz band and fixed satellite service earth stations in the 3.8 – 4.2 GHz band in metropolitan France.

download full doc, http://gsoasatellite.com/wp-content/uploads/2021-10-29-ESOA-contribution-ARCEP-consultation-on-C-Band.pdf, _blank